Quote #388
sent

Interior Painting

Created Sep 29, 2026
Customer
Stevi
506 Goldmoor Dr NE, Concord, NC, 28025
Valid Until
Oct 14, 2026
Salesperson
N/A

Scope of Work

• Remove popcorn Ceiling — Labor • Prep and Paint Ceiling — Labor and Materials • Prep and Paint Walls - per floor plan SF — Labor and material a Includes small repairs and taping • Paint Baseboards - per LF — Labor + Material • Paint door trims and window trims - per Unt — Labor and paint - only trimming not the actual door • Material used is: Duration on walls, Emerald on trims. Ceiling flat on ceiling. — note

Included in Selection:
  • •
    Remove popcorn Ceiling — Labor
  • •
    Prep and Paint Ceiling — Labor and Materials
  • •
    Prep and Paint Walls - per floor plan SF — Labor and material a Includes small repairs and taping
  • •
    Paint Baseboards - per LF — Labor + Material
  • •
    Paint door trims and window trims - per Unt — Labor and paint - only trimming not the actual door

Materials & Labor

Remove popcorn Ceiling
Labor
Qty 1730 × $1.30
$2,249.00
Prep and Paint Ceiling
Labor and Materials
Qty 1730 × $1.10
$1,903.00
Prep and Paint Walls - per floor plan SF
Labor and material a Includes small repairs and taping
Qty 1730 × $2.50
$4,325.00
Paint Baseboards - per LF
Labor + Material
Qty 573 × $1.40
$802.20
Paint door trims and window trims - per Unt
Labor and paint - only trimming not the actual door
Qty 18 × $45.00
$810.00
Material used is: Duration on walls, Emerald on trims. Ceiling flat on ceiling.
Qty 0 × $0.00
$0.00
Subtotal$10,089.20
Total$10,089.20
Required Deposit$5,044.60